NEBULAESTIMATING

Feel free to contact me for absolutely anything!
dante@nebulaestimating.com

Dante
Nebula Estimating Download PDF

Quote FF43A2AA · Draft for review

Kitchen & bathroom renovation

Orlando, FL

Estimate total$28,134.60

Price breakdown

Expand a section to see materials and labor.

Demolition and protection$1,584.00
DescriptionQtyAmount
Labor Protection, demolition and debris handling24 hours$1,584.00
Kitchen$13,468.20
DescriptionQtyAmount
Stock shaker base cabinets10 linear ft$2,760.00
Stock shaker upper cabinets8 linear ft$1,536.00
Cabinet fillers, panels, toe kicks, hardware and fasteners1 lot$540.00
Fabricated quartz countertop supply40 sq ft$3,120.00
Subway backsplash tile28 sq ft$201.60
Midrange LVP flooring159 sq ft$858.60
Kitchen flooring preparation and transition materials1 lot$264.00
Kitchen sink1 each$390.00
Kitchen faucet1 each$270.00
Kitchen LED light fixtures4 each$360.00
Labor Kitchen cabinetry, countertops, backsplash and flooring48 hours$3,168.00
Bathroom$7,850.40
DescriptionQtyAmount
Replacement alcove tub1 each$780.00
Tub surround tile66 sq ft$475.20
Tub surround backer and waterproofing system materials66 sq ft$633.60
30-inch vanity with top and basin1 each$840.00
Toilet with seat1 each$360.00
Bathroom floor tile44 sq ft$316.80
Bathroom floor tile underlayment materials44 sq ft$184.80
Bathroom mirror1 each$180.00
Bathroom light fixture1 each$168.00
Bathroom exhaust fan1 each$216.00
Labor Bathroom fixtures, waterproofing and tile56 hours$3,696.00
Reconnects and checks$1,056.00
DescriptionQtyAmount
Labor Plumbing and electrical reconnects and operational checks16 hours$1,056.00
Repairs and finishing$1,056.00
DescriptionQtyAmount
Labor Wall repairs, painting and final cleanup16 hours$1,056.00
Shared materials & disposal$3,120.00
DescriptionQtyAmount
Tile setting materials, grout, sealant and edge trim1 lot$510.00
Plumbing reconnection materials1 lot$450.00
Lighting and fan connection materials1 lot$270.00
Localized wall repair and surface preparation materials1 lot$192.00
Washable eggshell wall paint4 gallon$288.00
Interior spot primer2 quart$60.00
Renovation protection and cleanup supplies1 lot$216.00
Paint application kit1 kit$114.00
Renovation debris container and disposal fees1 job$1,020.00
Subtotal
$28,134.60
Tax (0%)
$0.00

Scope of work

Existing kitchen with wood cabinets and white appliances
Kitchen before renovation
Existing bathroom with alcove tub and vanity
Bathroom before renovation
Demolition and protection
Protect retained finishes and appliances, then remove the kitchen and bathroom components being replaced. Remove renovation debris for disposal while keeping the existing room layouts.
Kitchen
In the 12 × 12 ft kitchen, install 10 linear ft of stock shaker base cabinets, 8 linear ft of matching uppers, 40 sq ft of quartz countertops, 25 sq ft of subway backsplash and 144 sq ft of LVP. Install a sink, faucet and four LED lights, and reuse the existing appliances.
Bathroom
In the 5 × 8 ft bathroom, replace the tub and install 60 sq ft of tiled surround with waterproofing. Install a 30-inch vanity, toilet, 40 sq ft of floor tile, mirror, light and exhaust fan.
Reconnects and checks
Reconnect plumbing, electrical fixtures and retained appliances in the existing layout. Check plumbing connections for leaks and verify operation of installed fixtures and the exhaust fan.
Repairs and finishing
Repair walls disturbed by the renovation, prepare and paint the kitchen and bathroom, and clean the work areas. Use midrange finishes, with final selections to be confirmed.

Payment terms

50% deposit on acceptance. Balance due on completion.

Not included

  • Repair of concealed rot, mold, water damage, damaged framing or other concealed conditions.
  • Structural changes, layout changes, plumbing relocations, whole-circuit replacement, electrical panel upgrades or new exhaust duct routes.
  • Replacement or repair of retained appliances.
  • Hazardous-material testing or abatement.
  • Work outside the stated kitchen and bathroom renovation scope.
  • Concealed damage and work outside the scope. Changes require an updated quote.